Studio construction update

Not a terrifically sexy title for blog post, but what can you do? The studio is a work-in-progress and a little messy at the moment, but the final product is going to be terrific. This is my favorite view – the opening for second floor sliding glass doors looking over the alpine garden.

amys room

The roof has been sheathed, insulated, and prepped for the metal covering. Window framing is in place to allow cutouts, and the windows themselves should arrive tomorrow. This is the view down the driveway.

view from the driveway

Slowly but surely. . .

studio south side

 

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.